Quality. Safety. Reliability.

Who We Are.

Witflux stood strong with its core values foundation since the day 1 of establishment in December 2011 with only 10 staff. Today, with more than 100 staff in operation within the company, Witflux Engineering has caught the trustworthiness of the Singapore Engineering community sector with the credibility of our hard work and perseverance. Today, we are building the government and privatads of CW01 and CW02.

Our Projects.

DEVELOPMENT
MERLION CUB PROJECT
Design and build of waveforms and water basins for the Merlion Statue and Merlion Cub statue
SAFRA TOA PAYOH
General Building Works for SAFRA
TUAS MEGA SHIPYARD DORMITORY PROJECT
Construction of dormitory (5000pax) for Tuas Dormitory Mega Shipyard
JERVOIS ROAD RESIDENTIAL PROJECT
Architectural Work for Private Residential
SINGPOST LOGISTIC HUB PROJECT
Architectural work for industrial development
NEE SOON TOWN COUNCIL PROJECT
Construction of Covered Walkways in Chong Pang Division for Nee Soon Town Council
SUBSTATION AT SIMEI PROJECT
Neighbourhood Renewal Programme and electrical load upgrading to 38 blocks at Block 141, 142, 144 to 152, 153 to 163, 221 to 235 Simei Road for East Coast Town Council - RC Structural Works for Electrical Substation, CSR, Linkways and drop off porch etc.
CMC RAVENNA - MRT ARCH PROJECT
MACPHERSON DIVISION PROJECT
Repairs, redecoration and improvements works to block 22 of flats at Block 19 to 24, 30 to 33 Balm Road, Block 34 to 37, 79, 79A Circuit Road, Block 81, 82, 82A, 83
HEALTHY LIFESTYLE HUB
Healthy Lifestyle Hub for Neighbourhood Renewal Programme (NRP) at Block 441 to 455 Sin Ming Avenue / Bright Hill Drive
NEIGHBOURHOOD RENEWAL PROGRAMME (NRP)
Neighbourhood Renewal Programme (NRP) at block 441 to 455 Sin Ming Avenue/ Bright Hill Drive
SECOND CHANGI NEWATER PLANT DESIGN - B
Second Changi Newater Plant Design-Build-Own-Operate project - The supply of manpower, material and equipment to complete the construction of area 1,2 and 3 Kins fence and normal type of perimeter fencing
66KV SUBSTATION & DRAINAGE
Development of 6th waste-to-energy plan under a Design-Build-Own-Operate (DBOO) Scheme (NEA000ECO15000802)
LABOR FOR INSTALLATION OF GRANITE WORK
Labor for installation of granite works & pebble wash to station & entrance for C926 Tampines West station) and C927 (Bedok Reservoir station) & tunnels for downtown line 3
PRECAST PANEL & ARCHI WET TRADE WORK
Proposed Residential Flat Development of 4 blocks of 5 storey building (Total 175 units) with attic and basement carparks, swimming pool and communal facilities at Braddell Road and Sommerville Walk (Serangoon Planning Area) - Precast Panel & Archi Wet Trade Work

Leave Us a Message.