Portfolio.

DEVELOPMENT

MERLION CUB PROJECT

Design and build of waveforms and water basins for the Merlion Statue and Merlion Cub statue

SAFRA TOA PAYOH

General Building Works for SAFRA

TUAS MEGA SHIPYARD DORMITORY PROJECT

Construction of dormitory (5000pax) for Tuas Dormitory Mega Shipyard

JERVOIS ROAD RESIDENTIAL PROJECT

Architectural Work for Private Residential

SINGPOST LOGISTIC HUB PROJECT

Architectural work for industrial development

NEE SOON TOWN COUNCIL PROJECT

Construction of Covered Walkways in Chong Pang Division for Nee Soon Town Council

SUBSTATION AT SIMEI PROJECT

Neighbourhood Renewal Programme and electrical load upgrading to 38 blocks at Block 141, 142, 144 to 152, 153 to 163, 221 to 235 Simei Road for East Coast Town Council - RC Structural Works for Electrical Substation, CSR, Linkways and drop off porch etc.

CMC RAVENNA - MRT ARCH PROJECT

Lorem ipsum dolor sit amet consectetur adipiscing elit dolor

MACPHERSON DIVISION PROJECT

Repairs, redecoration and improvements works to block 22 of flats at Block 19 to 24, 30 to 33 Balm Road, Block 34 to 37, 79, 79A Circuit Road, Block 81, 82, 82A, 83

HEALTHY LIFESTYLE HUB

Healthy Lifestyle Hub for Neighbourhood Renewal Programme (NRP) at Block 441 to 455 Sin Ming Avenue / Bright Hill Drive

NEIGHBOURHOOD RENEWAL PROGRAMME (NRP)

Neighbourhood Renewal Programme (NRP) at block 441 to 455 Sin Ming Avenue/ Bright Hill Drive

SECOND CHANGI NEWATER PLANT DESIGN - B

Second Changi Newater Plant Design-Build-Own-Operate project - The supply of manpower, material and equipment to complete the construction of area 1,2 and 3 Kins fence and normal type of perimeter fencing

66KV SUBSTATION & DRAINAGE

Development of 6th waste-to-energy plan under a Design-Build-Own-Operate (DBOO) Scheme (NEA000ECO15000802)

LABOR FOR INSTALLATION OF GRANITE WORK

Labor for installation of granite works & pebble wash to station & entrance for C926 Tampines West station) and C927 (Bedok Reservoir station) & tunnels for downtown line 3

PRECAST PANEL & ARCHI WET TRADE WORK

Proposed Residential Flat Development of 4 blocks of 5 storey building (Total 175 units) with attic and basement carparks, swimming pool and communal facilities at Braddell Road and Sommerville Walk (Serangoon Planning Area) - Precast Panel & Archi Wet Trade Work